Geophysics Grid Planner
Plan magnetometer/resistivity survey grids and export field manuals.
Site Parameters
Survey Config
Survey Estimates
Active Grids:
0
Total Area:
0 ha
Distance Walked:
0 km
Data Points:
0
*Click grids on the map to toggle them active/inactive (e.g. for obstacles).
Site Layout Plan
N
Active Grid
Inactive
Traverse Line
Geophysics Survey Plan
Project:
Date Generated:
1. Methodology Summary
- Grid Dimensions:
- Traverse Interval:
- Sample Interval:
- Walking Strategy:
- Total Distance:
2. Site Map
3. Grid Coordinate Schedule
Coordinates are relative to the site origin (South-West corner = 0,0).
| Grid ID | SW Corner (x,y) | NW Corner | NE Corner | SE Corner |
|---|
