Feature Request Prioritization Matrix
Score features based on value, effort, and risk to determine objective priority.
Assign scores (1-5, where 5 is best) and define the weighting for the final Priority Score calculation.
Review the features sorted by the final Priority Score, which combines all weighted inputs. Higher scores indicate higher priority.
Highest Priority Score
0.00
Total Features Logged
0
Weighting Used
V(40) A(30) E(20) R(10)
Priority Score Distribution (0.0 - 5.0)
Features are grouped by their final calculated priority score.
| Rank | Score | Feature/Request | Owner/Metrics | V/A/E/R |
|---|
