Predictive Equipment Failure Dashboard
Assets at High Risk
0
Failures (Next 7 Days)
0
Avg. RUL (Days)
0
Model Accuracy
92.5%
Failure Probability Distribution
Assets by Remaining Useful Life (RUL)
High-Risk Assets (Top 10)
Equipment ID | Type | Failure Prob. (%) | RUL (Days) | Temp (°C) | Vibration (mm/s) |
---|
Add or Update Equipment Data
All Monitored Equipment
Equipment ID | Type | Location | Actions |
---|